The Bui Power Authority says it is monitoring its reservoir level to prevent a shutdown of the dam and the low generation of power.
Speaking to Radio Ghana, the Assistant External Communications Officer of the Authority, Mawuli Fui Kwadzovia, said the situation at the dam is as a result of a natural cause.
He said the dwindling level of water in the dam has reduced the generation capacity to about 1.44 million kilowatts a day.
Meanwhile, an energy expert, Kwame Jantuah, also expressed worry at the way the Bui Dam has been over stretched.
He said the energy crisis could have been prevented if the dam had been properly managed.
He called for effective planning and foresight to prevent and avoid future problems.
Source: GBC
Disclaimer: Opinions expressed here are those of the writers and do not reflect those of Peacefmonline.com. Peacefmonline.com accepts no responsibility legal or otherwise for their accuracy of content. Please report any inappropriate content to us, and we will evaluate it as a matter of priority. |