• Live Radio
  • Videos
  • About
  • Contact
  • Despite Media
Ghana Election 2020
  • Home
  • Local News
  • Politics
  • Showbiz
  • Sports
  • Business
  • Opinion
  • VIDEOS
  • Media
    • Videos
    • Audio
    • Live Radio
    • Photos
  • Election 2020
Local News
 
 
 
Home News General News 202212

Bawumia Cuts Sod For Tema Motorway Roundabout Phase 2

05-Dec-2022
/ General News, News
Email
Print
Comments 0
(0)
Comments
Share on Facebook Share on Twitter
 

The Vice President, Dr Mahamudu Bawumia, has signaled the beginning of construction works on the ‘Improvement of the Tema Motorway Roundabout Phase 2’ project.

The project, which is to provide a third tier on the existing two-tier interchange brings to over 12, the number of interchanges that the Government of President Nana Addo Dankwa Akufo -Addo has either completed or is working on.

Performing the sod-cutting ceremony on Monday, December 5, 2022 Vice President Bawumia listed them as the Tema Motorway Interchange Phase 1 (completed); Obetsebi Lamptey Interchange Phase 1 (completed); Pokuase Interchange (first four-tier interchange –completed); Tamale Interchange (completed).

The rest are Obetsebi Lamptey Interchange Phase 2 (Ongoing); Takoradi PTC Interchange (Ongoing); Nungua Interchange (Ongoing); Adjiringanor Interchange (Ongoing); Kpone Interchange (Ongoing); Savana Interchange (Ongoing); Dawhenya Interchange (Ongoing); Prampram Interchange (Ongoing); and Suame Interchange (Contractor mobilizing to site).

According to officials of the Ministry of Roads and Highways, the Improvement of the Tema Motorway Interchange Phase 2, expected to be completed in 30 months, will involve the construction of a viaduct to link the Tema Harbour Road towards the Ashaiman roundabout on the Akosombo Road. The grade separation will improve traffic flows around the Tema Motorway roundabout.

Other road and traffic flow improvement works are also in the offing, Vice President Bawumia disclosed.

“As part of measures to improve traffic flow between Tema and Accra, the Accra- Tema Motorway will be upgraded into a ten-lane facility. Phase 1 of the project will be between Tema Roundabout and the Tetteh Quarshie Interchange. The works will include a four lane, concrete pavement expressway; 3 lane asphaltic concrete service roads on either side; construction of Lashibi, Community 18 and Teshie Link Interchanges and the remodeling of the Tetteh Quarshie Interchange.

“Financing arrangements are being finalized for the works to commence soon,” he hinted.

Government is also undertaking a number of critical road works within the Greater Accra Region, Dr Bawumia indicated, including construction of the Tema-Aflao Road (17km) Phase 1, which involves the provision of service lanes and four interchanges between Tema Motorway Roundabout and Mitshio on the Tema-Aflao Road; construction of the Tema-Akosombo Road (64km), involving the dualization of the road and construction of two interchanges at Ashaiman and Asutsuare.

Dualization of the Beach Road Phase 1 between Osu and Nungua with the provision of bridges over the Kpeshie and Songor Lagoons is also ongoing, with the Phase 2, which involves dualization of the Beach Road from Nungua to Tema Community Three and includes the construction of a three-tier interchange at Nungua and widening of the railway bridge towards Sakumono is at 82% completion.

As well, rehabilitation of the 23km Dome-Kitase road, including the provision of access to the Ashesi University, and construction of the Borteyman Road (from School Junction to Nungua Farms, involving the dualization of the road between School Junction on the Ashalley Botwe Road and the Accra Tema Motorway to provide access to the proposed stadium for the All-African Games is also ongoing.

“Ladies and gentlemen, 413.20 km of Asphalt overlay has been laid in Greater Accra from 2021 to date. This brings the total asphalt overlay works completed in the Greater Accra Region to 947.80km since 2017,” Vice President Bawumia stated.

On behalf of President Akufo-Addo and the people of Ghana, Dr Bawumia thanked the Government and people of Japan who through JICA have provided grant funding for the entire works, and urged the Ministry of Roads and Highways, the Consultant as well as the Contractor to ensure that adequate traffic management measures are put in place during Construction to reduce the inconvenience that the works will bring to the travelling public and residents.

Source: Peacefmonline.com

 

 
 

 

Comments ( 0 ): Post Your Comments >>

Disclaimer: Opinions expressed here are those of the writers and do not reflect those of Peacefmonline.com. Peacefmonline.com accepts no responsibility legal or otherwise for their accuracy of content. Please report any inappropriate content to us, and we will evaluate it as a matter of priority.
Featured Video
Previous Post

Student Apologises To Nigeria First Lady For Tweet

Next Post

Be Discipline And Demonstrate Competence In Skill Development Chancellor Of PUG Tells Graduands

 
 

More Stories

Charles Owusu Leads PHDC Team To Update People Of Jomoro On Petroleum Hub
We Must Change The Narrative About Africa – Bawumia Urges Africa Prosperity Dialogues Summit
Kwahu Summit 2023: Africa’s Challenges Are Opportunities To Develop - Wamkele Mene
US Bars Entry For Nigerians 'Undermining' Democracy
Pope's DR Congo Visit A Dream Come True – Archbishop
Nigerians Question Tinubu's Election Sabotage Claims
Uproar Over Germany's Dig At Russian Envoy Africa Tour
Assin State College Receives Dano “Inner Strength” Award
I Will Review Free SHS As President - Joe Ghartey
Next Post

Be Discipline And Demonstrate Competence In Skill Development Chancellor Of PUG Tells Graduands

  Local News

  • General News
  • Social
  • Health
  • Education
  • Religion
  • Technology
  • Crime & Justice
  • Travel/Tourism
  • Science/Environment


 
 

 

Other General News Stories

  • Charles Owusu Leads PHDC Team To Update People Of Jomoro On Petroleum Hub

  • We Must Change The Narrative About Africa – Bawumia Urges Africa Prosperity Dialogues Summit

  • Kwahu Summit 2023: Africa’s Challenges Are Opportunities To Develop - Wamkele Mene

  • US Bars Entry For Nigerians 'Undermining' Democracy

  • Pope's DR Congo Visit A Dream Come True – Archbishop

  • Nigerians Question Tinubu's Election Sabotage Claims

  • Uproar Over Germany's Dig At Russian Envoy Africa Tour

  • Assin State College Receives Dano “Inner Strength” Award

  • I Will Review Free SHS As President - Joe Ghartey

  • You Can Run Riot On Akufo-Addo But Not Parliament – Haruna Iddrisu Warns Ofori-Atta Over DDEP

 

 
 

Popular Videos

Akan News @ 6am On Peace 104.3 FM (22/1/2023)

Peace Power Sports (22/01/2023)

Kokrokoo Live On Peace 104.3FM(23/1/2023)

Akan News @ Midday On Peace 104.3 FM (23/01/2023)

HELLO POWER SPORTS (23/01/2023)

Akan News @ 8pm On Peace 104.3 FM (23/01/2023)

Peace FM Online and Despite Media

peacefmonline.com offers its reading audience with a comprehensive online source for up-to-the-minute news about politics, business, entertainment and other issues in Ghana

Follow us on social media:

Category

  • Home
  • Local News
  • Politics
  • Showbiz
  • Sports
  • Business
  • Opinion
  • Trivia
  • Foreign
  • Audio
  • Photos
  • Videos
  • Elections
Decision Time
Ghana Election 2020 2016 Elections
Services
Live Radio Audio on Demand Ghana Elections Advertise with Us
Useful Links
Despite Media About Us Contact Us Feedback Form Terms and Conditions Privacy
Our Brands
Despite Media UTV Peace FM Okay FM Hello FM Neat FM Peacefmonline
  • About
  • Advertise
  • Terms & Conditions
  • Contact
  • Privacy

© 2020 Peacefmonline.com - An online portal owned and managed by Despite Media

  • Home
  • Local News
  • Politics
  • Showbiz
  • Sports
  • Business
  • Articles
  • Trivia
  • Foreign
  • Live Radio
  • Photos
  • Videos
  • Audio
  • Election 2020

© 2020 Peacefmonline.com - An online portal owned and managed by Despite Media