Weija Water Control Panels Repaired�.Water Finally Flows!

Peacefmonline.com can confirm that two of the three control panels at the Weija Headworks of the Ghana Water Company Limited (GWCL) that developed an electrical fault and subsequently broke down have been repaired.

 
Recipient Email: *
 
Your name: *
Your Email: *